
- Type
- Lesson plan
- Ages
- Ages 6-13
- Duration
- 45 min
- Level
- Beginner
- Includes
- Quiz: 5 questions
Why are tunnels important for connecting places, and what job roles are essential to build them safely?
Overview
This lesson introduces students to large-scale infrastructure and civil engineering through the Lower Thames Crossing project. Learners discover why tunnels are vital for regional transport and explore the wide variety of professional careers required to plan, manage, and build subterranean routes.
Inside Minecraft, students begin in an office environment to learn foundational project details before moving to an active road scheme. After interviewing on-site professionals, learners head underground in creative mode to dig through the tunnel face and place concrete lining while carefully guarding against groundwater breaches.
Learning objectives
By the end of this lesson students will be able to:
- Identify key professional roles involved in planning and constructing a major tunnel.
- Excavate a designated section of a tunnel face according to instructional guidance.
- Construct concrete tunnel walls while preventing groundwater from flooding the workspace.
- Explain how tunnels serve as crucial transportation links between different regions.
Blocks and items used in this lesson
Key vocabulary
- Groundwater
- Water present beneath Earth's surface that can leak into underground excavations.
- Lower Thames Crossing
- A major real-world road and tunnel infrastructure project designed to connect regions.
- Concrete
- A durable construction material used to reinforce and line tunnel interiors.
- Excavation
- The process of digging out rock and soil to form an underground passage.
Before class
Lesson sequence
Suggested timing: about 45 minutes in total.
- Highways England Office Exploration5 min
Students spawn inside the virtual Highways England offices. Allow them five minutes to walk through the space, interacting with various non-player characters to gather background information. Direct students to finish this stage by speaking with the character named Drew near the blue doorway, without clicking teleport options prematurely.
- Road Scheme Site Induction10 min
Students interact with the hallway NPC labeled LTC Tunnel Digging Game and select the Key Stage 2 button to teleport to the project site. After speaking with Nadia outside the portacabin, students explore the compound for ten minutes to speak with workers and collect facts about engineering roles before gathering at the tunnel mouth.
- Tunnel Excavation and Construction25 min
Students read the instruction boards and talk to the entryway NPC, who switches them into creative mode. Working along the tunnel face, students dig out earth blocks and build structural concrete walls. They must work deliberately to keep groundwater from flooding the work area, using the corner reset NPC if water completely breaches the chamber.
- Reflection and Role Review5 min
Bring the group together to review the excavation challenge. Ask students which real-world jobs on the site interested them most and discuss how real engineers manage environmental hazards like groundwater during underground builds.
Assessment: success criteria
- Student navigates the site and identifies multiple job roles from NPC dialogues.
- Student follows on-screen boards to break designated blocks along the tunnel face.
- Student successfully places concrete blocks to line the tunnel structure.
- Student manages water hazards to complete or advance excavation without unresolved flooding.
Differentiation
Pair students together to divide block removal and concrete placement, and remind them of the corner reset NPC if water floods their chamber.
Ask fast finishers to fully seal and smooth their concrete tunnel walls while cataloging the specific job duties mentioned by every NPC on the road scheme.
Knowledge check
5 questions to check understanding after the lesson. Tap an answer to see if it is right; the score appears at the end.
1Which character must students speak to near the blue doorway before leaving the office?
Answer: B. The lesson directs students to conclude their office exploration by speaking with Drew near the blue doorway.
2What risk must students manage while digging out the tunnel face?
Answer: C. Students must dig carefully so that groundwater does not breach the excavation and flood the work site.
3Which button should students select on the hallway NPC to access the appropriate virtual road scheme?
Answer: A. The student instructions state that players must click the Key Stage 2 button on the hallway NPC.
4What building material are students instructed to place to create the tunnel structure?
Answer: B. According to the task description, students dig blocks away and build with concrete to line the tunnel.
5Where is the reset NPC located if a student accidentally floods their tunnel?
Answer: D. A special NPC is situated in the corner of the tunnel work area to reset the environment if flooding occurs.
Frequently Asked Questions
How do students obtain the ability to build and place concrete blocks?
An instruction non-player character stationed right before the tunnel entrance automatically changes each student's game mode to creative mode.
What happens if a workspace completely fills with water during digging?
Students can speak to a special reset character located in the corner of the dig site, which restores the tunnel face so they can try again.
Adapted from LTC Tunnel Digging Junior Game by Block Builders on Minecraft Education, last updated Sep 27, 2021. This classroom version, the timings and the quiz were written by 9Minecraft Education.















